ENGINEERING / PROCUREMENT / SITE EXECUTION
Defined scope.
Controlled
delivery.
An energy project is a chain of decisions. Connect the design basis, supplier packages and site work before committing to construction.
We help structure and coordinate defined projects, with qualified specialists responsible for their appointed work and a delivery model matched to the scope.

Engineering · Procurement · Installation
Basis · Release · Readiness · Acceptance
A sequence from requirement to handover
THE DELIVERY ROUTE
Sequence the decisions.
Then mobilize.
Resolve uncertainty while change is still manageable. Each stage should establish the basis for the next commitment.
- 01 /
Define
Set the operating objective and the limits of the assignment.
- 02 /
Assess
Review site evidence, technical options and the approval route.
- 03 /
Structure
Agree parties, work packages, commercial terms and acceptance tests.
- 04 /
Deliver
Coordinate authorized work and control changes to the approved scope.
- 05 /
Verify
Close tests, records, training and the handover requirements.
A planning framework. The contract establishes each party’s obligations, authority and performance commitments.
Make the basis clear before the commitment.
Translate the business objective into an operating requirement. Existing facilities, drawings and site conditions establish capacity, equipment interfaces, utilities, available space and the approvals the project may need.
Missing information calls for a survey, feasibility review or front-end scope. Construction pricing and a firm delivery commitment need a sufficiently developed design basis, realistic shutdown access and a workable commercial arrangement.
Assign the engineering. Connect the interfaces.
Coordinate the design basis, equipment specifications, layouts and document flow so that the appointed disciplines work against the same requirement. Qualified designers retain responsibility for their calculations, technical approvals and specialist design work.
A responsibility matrix should state who prepares, checks, approves and implements each critical document. Proposed changes need a review of cost, programme, safety and operating consequences before they become approved instructions.
THREE WORKSTREAMS / ONE AGREED BASIS
Every package needs an accountable owner.
Coordination connects the work. Specialist design, supply and construction responsibility must be explicit.
Design basis → specifications → qualified review
Comparable enquiries → selection → supply conditions
Site readiness → execution → test records
Compare the installed obligation.
Build enquiries around a common technical and commercial basis. Procurement support can cover bid comparisons, vendor questions, document tracking and inspection coordination. Assess duties, freight, installation needs, spares, warranty and local support alongside equipment price.
Supplier selection and purchases follow the agreed authorization route. Identify long-lead items and foreign-currency exposure early enough to inform the programme; a quoted equipment price alone does not define a project’s delivered cost.

Build the plan around the live site.
Installation requires suitable contractors, supervision and a site-specific execution plan. Resolve access, lifting, isolation, hot work, shutdowns and simultaneous operations before bringing a team to site.
During delivery, supervision should track progress, quality evidence and interfaces, with corrective actions assigned and followed through. Changes to the contracted work must be recorded through its variation process rather than absorbed as informal site instructions.
Define acceptance before testing begins.
An approved commissioning plan connects inspection, functional testing, protective systems and operating checks to the equipment’s agreed duty. Performance promises apply only to the equipment, conditions and criteria written into the contract.
Handover needs more than a start-up event. Close out test records, operating instructions, maintenance requirements, training and warranties, and agree how any outstanding items will be completed.
Match the contracting model to the risk.
For a bounded industrial package, the customer may engage equipment suppliers and installation contractors directly, with EXPONENT PETRO coordinating their interfaces under an agreed mandate.
Complex or specialist work may need an EPC principal, consortium or subcontract arrangement with verified qualifications, financial capacity and insurance. The proposal must identify the contracting parties and the design, construction and performance obligations each accepts.
Start with a package you can fund.
A useful first conversation starts with the objective, site, current design stage, funding position and desired completion window. Those inputs help distinguish a study, a procurement package and an executable installation scope.
Choose a first assignment with a defined deliverable and a practical approval path. It gives the next investment decision a basis that can be priced, commissioned and managed.
FOUR INTERFACE GATES
Check readiness
at each release.
Use these decision points to shape a project-specific control plan. Gate evidence and approval authority are agreed for the assignment.
Basis confirmed
Operating duty, site information and specialist responsibilities are sufficiently defined.
Purchase released
Specification, commercial comparison, exclusions and authorization align.
Site ready
Access, contractors, work permits and shutdown arrangements support the planned scope.
Acceptance recorded
Tests, documentation, training and remaining obligations are checked against the agreement.